 |
Knowledge of piping materials like - fittings, valves,
supports, gaskets. |
 |
Able to know basic maths and geometry. Able to read
drawings, symbols, isometrics.
|
 |
To prepare required unit pieces of piping systems such
as manifolds, spools, supports etc. |
 |
To carry out welding on carbon steel, stainless steel
pipe and vessels. |
|
|
Eligibility: |
|
 |
Vocational or industrial trade training with 2 to 3
years experience in mechanical trade in oil &
gas industry. |
 |
Alternatively any equivalent
qualifications.
|
|
|
Course Contents: |
|
 |
Introduction of role of pipe fabricator at
construction sites. |
 |
Identification of Piping systems, classifications,
color coding, legend letters. |
 |
Practical handling of gas cutting, blow pipe, managing
back fire incidents etc.
|
 |
Handling and carrying out piping systems, with all
types of piping hardware.
|
 |
Study of drawings, symbols, preparation of bill of
materials and part lists. |
|
|
Course Duration: |
|
 |
6 weeks |
|
|
Methodology:
|
|
|
Techskill observes sequence of actions.
a) Inquiry from client
b) Finalizing client's exact requirements
c) Submission of proposal
d) Conduct discussions on contractual aspects and
e) Commence training. |
|
|
Infrastructure: |
|
|
All types and sizes of pipes, pipe fittings and pipe
supports available. Availability of standard and
special tools for pipe fabrication work. Available
measuring tools.
|
|
|
Assessment & Grading of
trainees:
|
|
|
To ensure proper progress of training, Techskill
periodically conducts assessment of all trainees.
Normally a review at the beginning of course then in
middle of course duration and finally on completion of
course. |
|
|